How Commercial Zoning Works In Rutherford County

January 1, 2026

Buying a site, renovating a building, or signing a lease in Rutherford County can move fast, but zoning can slow you down if you do not know the rules. You want a clear path that protects your timeline, your budget, and your deal. In this guide, you will learn how commercial zoning works in Rutherford County and its cities, where to verify what is allowed, and how approvals and timelines usually play out. Let’s dive in.

Start with jurisdiction basics

Zoning authority depends on location. Rutherford County regulates parcels in the unincorporated county. If a property sits inside Murfreesboro, Smyrna, or La Vergne, the city’s zoning ordinance and process control the project. The first step is confirming where the parcel sits relative to city limits.

Municipal annexation can change jurisdiction. If you are evaluating a property near a city boundary, ask planning staff whether any recent or pending annexations could affect zoning, utilities, or approvals. A quick confirmation can prevent surprises later.

Who to contact

  • Rutherford County Planning and Codes for unincorporated parcels
  • City of Murfreesboro Planning for property inside Murfreesboro
  • Town of Smyrna Planning for property inside Smyrna
  • City of La Vergne Planning for property inside La Vergne
  • Rutherford County Property Assessor or county GIS for parcel IDs, ownership, and boundary layers
  • Tennessee Department of Transportation for driveway or access to state routes

How to look up a parcel

Follow a consistent process so you do not miss a constraint or approval history that could change your plan.

Step 1: Identify the parcel

Use the Rutherford County Property Assessor or GIS to search by address, owner, or parcel ID. Pull the parcel ID, acreage, and legal description. Confirm whether the parcel is inside city limits by turning on the municipal boundary layer.

Step 2: Confirm zoning and overlays

Open the correct zoning map for the jurisdiction. If the parcel is inside a city, use that city’s zoning map and ordinance. If it is in the unincorporated county, use the county’s zoning map and ordinance. Look for overlay districts and special planning areas, such as historic districts, corridor overlays, Planned Unit Developments, and any economic development or redevelopment areas.

Step 3: Read the zoning text

Do not stop at the map. Read the district’s ordinance section for permitted uses, conditional or special uses, and prohibited uses. Note quantitative controls that drive layout and costs, including setbacks, height, lot coverage, landscaping, lighting, and signage. Review parking ratios and any allowance for shared parking or reductions.

Step 4: Check other maps and records

Review floodplain and floodway layers, wetlands and other environmental constraints, and roadway classification and jurisdiction. Confirm water and sewer service boundaries and capacity. Search recorded plats, easements, covenants, and restrictions with the county’s recording office.

Step 5: Review permit and approval history

Ask planning staff for prior site plan approvals, variances, or conditional use permits. Look up building permits, certificates of occupancy, and any code enforcement history. These records can reveal constraints, conditions, or nonconforming status that affect your timeline and costs.

Zoning rules that shape your project

Commercial feasibility turns on a handful of ordinance standards. Here is what to focus on.

Allowed vs conditional uses

Each district lists uses allowed by right and uses allowed with a conditional or special use permit. Uses like retail, office, restaurant, childcare, automotive services, self storage, and light industrial may fall into different buckets by district. Conditional uses usually require an application, public notice, staff review, and a decision body that can impose conditions such as extra buffering or limited hours.

Setbacks, height, and buildable area

Setbacks, height limits, and lot coverage define the buildable envelope and can make or break a redevelopment. Some districts allow flexibility through planned developments or PUDs. When evaluating a site, sketch a quick test fit that respects setbacks and height so you can sanity check floor area against your program.

Parking and loading

Parking ratios vary by use and jurisdiction. As a general guide, many ordinances use ranges like approximately 2.5 to 5 spaces per 1,000 square feet for retail and approximately 2.5 to 4 per 1,000 for office. Restaurants often require higher ratios, sometimes 10 or more spaces per 1,000 square feet. Many codes allow shared parking or reductions for mixed use or transit access. Loading areas and service access are also regulated and should be included early in your layout.

Stormwater and environmental

Redevelopment can trigger stormwater detention or water quality measures based on local thresholds and increases in impervious area. Floodplain and wetlands can limit building footprints and may require permits or special design. Include erosion control and stormwater design early with your civil engineer to avoid redesigns.

Utilities and sewer

Water and sewer availability and capacity can be determinative. In some areas, annexation may be required to access city utilities. Confirm service boundaries, capacity, fees, and timelines with utility staff. If public sewer is not available, you may face septic constraints that limit density or specific uses.

Access and traffic

Driveway permits come from the authority that controls the roadway. That can be the city, the county, or the Tennessee Department of Transportation for state routes. Larger projects often trigger a Traffic Impact Study based on trip generation thresholds set in local ordinances or engineering standards. Off site improvements like turn lanes may be required as conditions of approval.

Buffers, landscaping, and lighting

When commercial sites sit next to residential zones, expect required landscape buffers and sometimes masonry walls or fences. Codes also regulate lighting levels and fixture types. Plan these elements into your site from day one so you do not lose buildable area late in design.

Signage and design review

Sign types, sizes, and illumination are regulated by district and overlay. If a property sits in a historic district or design overlay, you may need separate design review and approvals before permits can be issued.

Nonconforming status

If an existing use or structure does not match today’s code, it may be nonconforming. Rules vary on continuation, expansion, and rebuilding after damage. Ask staff to confirm status in writing before you underwrite a change of use or an expansion.

Approvals and timelines

Commercial projects typically move through a predictable set of reviews. Sequence and duration vary by jurisdiction and scope.

Common approvals

  • Zoning verification letter that confirms current zoning and permitted uses
  • Site plan review for compliance with zoning and development standards
  • Conditional or special use permit where required by the use table
  • Rezoning when a district change is needed
  • Variance for relief from strict dimensional standards such as setbacks or height
  • Building permits and trade permits, followed by inspections and a Certificate of Occupancy
  • Utility taps and impact fees, with capacity review as needed
  • Driveway or access permits from the city, the county, or TDOT, depending on the roadway

Typical timelines

  • Minor site plans and administrative reviews often take several weeks to a few months
  • Major site plans, rezonings, or projects that require a Traffic Impact Study or off site improvements can take multiple months to a year or more
  • Variances and conditional use permits depend on hearing schedules and the need for plan revisions

Public notice and input

Rezonings and many conditional use requests require mailed notice to adjacent owners, posting of site signage, and newspaper notice. Build time for public comment into your schedule and be prepared to address neighborhood concerns for uses that generate traffic, noise, or late-hour activity.

Due diligence checklist

Use this checklist to keep your evaluation on track.

  • Confirm the jurisdiction and zoning district. Request a written zoning verification letter.
  • Read the district’s use table and development standards. Note any conditional use requirements.
  • Pull recorded plats, covenants, easements, and restrictions. Confirm access and utilities.
  • Verify city limits, annexation history, and whether annexation is needed for utilities.
  • Request water and sewer capacity confirmation and fee schedules from utility staff.
  • Map floodplain, floodway, and wetlands. Confirm local stormwater requirements and thresholds.
  • Order a current survey. Use ALTA/NSPS standards for purchase and finance transactions.
  • Review driveway jurisdiction and access requirements. Coordinate early with the road authority.
  • Calculate parking and loading needs for your intended use based on the ordinance.
  • Ask staff whether a Traffic Impact Study will be required for your project scope.
  • Confirm building code items such as fire access and occupancy specific standards for uses like restaurants or childcare.
  • Run a code enforcement and permit history check. Identify any outstanding violations or liens.
  • Obtain a title commitment and review for encumbrances that affect site design.
  • If there is any chance of contamination, order a Phase I Environmental Site Assessment.
  • Build a fees and timelines budget that includes impact fees, tap fees, permit costs, and inspection escrows.
  • If within a historic or design overlay, review the design approval process and standards.

Example path for sites across Rutherford County

Follow these steps whether your site is in Murfreesboro, Smyrna, La Vergne, or the unincorporated county.

  1. Confirm jurisdiction and request a zoning verification letter from the appropriate planning office.
  2. Order a current survey and title commitment. Pull and review recorded easements and covenants.
  3. Contact utilities to confirm water and sewer availability, capacity, and tap fees. Ask for a capacity letter if available.
  4. Engage a civil engineer to test setbacks, parking, stormwater, and building size. Include loading and fire access in the test fit.
  5. If a rezoning or conditional use is likely, build an entitlement strategy and timeline. Consult a land use or municipal attorney as needed.
  6. If the site is on a state route or near one, contact TDOT early for driveway and access permits and any required traffic studies.

How NEW SOUTH COMMERCIAL helps

You want practical, execution-focused advice that blends brokerage and owner-operator thinking. That is our lane. We help you narrow sites, validate zoning and utilities early, and map the approvals you will need so you can move from interest to action with fewer surprises. When a rezoning or conditional use is the right path, we coordinate with experienced land use attorneys, civil and traffic engineers, and utility contacts to align design, schedule, and cost.

If you are an owner planning a reposition, a tenant seeking a strategic location, or an investor underwriting a value-add play, we bring principal-level attention, local market insight, and a clear process to your search and execution. When you are ready, reach out to NEW SOUTH COMMERCIAL to discuss your project and next steps.

FAQs

How do I confirm if my intended use is allowed on a Rutherford County property?

  • Identify the property’s jurisdiction, find the zoning district on the official map, then read the use table in the ordinance for permitted versus conditional uses. For certainty, request a written zoning verification letter from planning staff.

What is the process to rezone a site in Rutherford County or its cities?

  • Rezoning is a legislative process with an application, staff report, public notice, a Planning Commission recommendation, and a final decision by the governing body. It can take months and approval is discretionary.

When will my commercial project need a Traffic Impact Study in Rutherford County?

  • Thresholds vary by jurisdiction and are often based on trip generation during peak hours or project size. Planning or engineering staff can confirm if your scope triggers a study.

How many parking spaces will I need for a new retail or office use?

  • Parking ratios are set in the local ordinance and differ by use. As a general guide, many codes range around 2.5 to 5 spaces per 1,000 square feet for retail and 2.5 to 4 for office, with higher ratios for restaurants.

Are there incentives for commercial redevelopment in Rutherford County’s cities?

  • Municipalities and the county may offer economic development tools such as tax incentives or redevelopment programs. Contact the local economic development office and planning staff for current options.

What are common pitfalls when buying or leasing a commercial site in Rutherford County?

  • Assuming utilities are available without confirmation, missing recorded easements or covenants, underestimating parking or stormwater requirements, underestimating rezoning time, and overlooking driveway jurisdiction such as TDOT for state routes.